ARAI/TA(MOD_SM)/INDUS/OMS 101/2005-07                                                          Dated 4 March 2005

 

Cert

Annex

Drg

Total

1

7

0

8 pgs

CERTIFICATE

FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES

 

M/s Indus Scientific Pvt. Ltd.

112B, Hennur Main Road, Hennur Bande

Bangalore 560 043

 

Smoke Meter Model OMS 101 from M/s Indus Scientific Pvt. Ltd., Bangalore, was type approved vide ARAI Certificate dated 2nd February 2000.  The same smoke meter model was additionally examined and tested for modifications such as incorporation of measurement of sump oil temperature, engine rpm and free acceleration procedure as per the revised test procedure specified in MoRTH/CMVR/TAP-115/116, Issue No. 2, Part VIII.

 

Based on the above, it is certified that the smoke meter Model OMS 101 manufactured and marketed by M/s Indus Scientific Pvt. Ltd., Bangalore, meets the requirements of the provisions of Rule 116(3) of the Central Motor Vehicles Rules 1989, as amended up-to-date, for the smoke meter.

 

The smoke meter Model OMS 101 is suitable for measurement of free acceleration smoke of in-use diesel vehicles fitted with CI engines, as per CMVR 115(2), subject to following conditions :

         i.      For the instruments already supplied in the field, the supplier shall carry out modifications as per Annexure-B and issue a compliance certificate based on which the Transport Authorities concerned will grant extension of validity to the respective PUC Test Centre for the purpose of PUC testing as per revised test procedure.

       ii.      The name of the model will be included by ARAI in the approved list of PUC Equipment only on compliance to (i) above by the supplier.

      iii.      The supplier shall abide by the Code of Practice attached herewith as Annexure-A.  The supplier has already submitted an affidavit to this effect.

     iv.      The supplier shall enter into AMC agreement on annual basis with the authorized PUC Test Centres to whom this model is supplied.  The AMC terms shall be as per the Code of Practice referred in (iii) above.

 

This Type Approval certificate is valid for the period of 5 years from the date of its issue or any amendment in the test procedure, whichever is earlier.

 

The last Conformity of Production (COP) was carried out for the supply of units manufactured till 15th November 2003.  The next COP testing shall be completed on or before 15th November 2005 or production of 100 units from 16th November 2003, whichever is earlier.

Authorised Signatory

 

 

A.B. Komawar                                                                                                              B. Bhanot

Dy. Director                                                                                                                  Director         

 

Place of Issue : Pune

 

Ref :

i)        ARAI Type Approval Certificate No.ARAI/CMVR/INDUS/OMS101/B/R 116(3)/2000-02 dated 2nd Feb 2000 (Original Type Approval Certificate)

ii)              ARAI Type Approval Test Report No.AED/TR/SPR No.172/2004-2005/INDUS-Bangalore/2005-30 dated 04 March 2005. (Approval for modifications as per new requirements).

 

ARAI/TA(MOD_SM)/INDUS/OMS 101/2005-07                                                          Dated 4 March 2005

 

ANNEXURE  - A

 

CODE OF PRACTICE FOR PUC EQUIPMENT MANUFACTURER / SUPPLIER

 

 

1.                   PUC equipment manufacturer / supplier should include the description of the test procedure described in Part I or Part II, whichever is applicable, amended from time to time of the document MOST/CMVR/TAP 115/116 in the user’s manual of the PUC equipment.  PUC equipment manufacturer / supplier shall keep PUC operator informed about the changes in the test procedure in future.

 

2.                   PUC equipment manufacturer/ supplier shall supply copy of type- approval certificate with date of validity along with the PUC equipment.

 

3.                   The validity of the type approval certificate of the PUC equipment shall be 5 years, after the expiry of which the PUC equipment manufacturer/ supplier shall get it re-validated from the test agency.

 

4.                   PUC equipment manufacturer / supplier shall provide the status of production/ supply of PUC equipment at a regular interval of 1 year to the test agency from where the equipment has been certified.

 

5.                   PUC equipment manufacturer / supplier shall submit the equipment for COP as per procedure mentioned above.

 

6.                   PUC equipment manufacturer / supplier shall enter into AMC on annual basis with the authorised PUC test agency based on charges as approved and finalized in EECG meeting as per Annexure-4. This AMC contract shall include 3 visits and equipment calibration as per field calibration procedure given in Annexure-1.  PUC equipment manufacturer/ supplier shall provide calibration certificate as per format given in the Annexure-2.

 

7.                   PUC equipment manufacturer / supplier shall train minimum 3 operators of PUC test agency and shall provide training certificate as per format given in Annexure 3. 

 

 

***********


 

ARAI/TA(MOD_SM)/INDUS/OMS 101/2005-07                                                          Dated 4 March 2005

 

ANNEXURE – 1 TO ANNEXURE – A

 

FIELD CALIBRATION PROCEDURE FOR TESTING OF

 

GAS ANALYSERS

 

 

1.0              INTRODUCTION

 

This procedure has to be carried out on gas analysers after they are commissioned in the field and for the subsequent calibration.

 

2.0              TESTING

 

The test procedure for gas analysers is as follows:

 

i)                    Check that the power supply is as per specifications of the manufacturer and electrical earthing is proper.

 

ii)                   Check that all the accessories as per manufacturer are available and are functioning properly.

 

iii)                 Check the span and zero calibration using sample gas of suitable value for CO as well as HC.

 

iv)                 Check the electrical calibration.

 

v)                  Check that the sampling system is leak proof.

 

vi)                 The printer is working correctly and the print out details are correct.

 

vii)               Checking of 1 no. of vehicle for idling emission measurement using this analyzer.

 

 

************

 

 

 

 

 


 

ARAI/TA(MOD_SM)/INDUS/OMS 101/2005-07                                                          Dated 4 March 2005

 

 

ANNEXURE – 1 TO ANNEXURE – A (contd…..)

 

FIELD CALIBRATION PROCEDURE FOR TESTING OF

 

SMOKE METERS

 

1.0               INTRODUCTION

 

This procedure has to be carried out on meters after they are commissioned in the field and for the subsequent calibration. 

 

2.0               TESTING

 

The test procedure for smoke meters is as follows:

 

i)                   After the warm-up of the meter, the calibration of the meter has to be checked at zero and midscale point with the neutral density filter available.  The value must lie within 0.1 m-1.

 

ii)                  The meter shall have the standard accessories as specified by the manufacturer.  It shall be checked that the sample hose, internal pipes etc are not deteriorated or damaged to ensure that there is no leakage.

 

iii)                The functionality of oil temperature and RPM sensor.

 

iv)                The heating system for the optical chamber is functioning.

 

v)                 The purge air system is working correctly.

 

vi)                Visual displays are functioning correctly.

 

vii)              The printer is working correctly and the printout details are correct.

 

viii)             The instrument casing is proper and has proper electrical earthing.

 

ix)                Free acceleration test is carried out using a vehicle and the print out details are checked.

 

 

 

************

 

 


 

ARAI/TA(MOD_SM)/INDUS/OMS 101/2005-07                                                          Dated 4 March 2005

 

ANNEXURE – 2 TO  ANNEXURE - A

 

CALIBRATION CERTIFICATE FORMAT

 

 

1.0

Component:

PUC equipment model:

Sr. No.

 

2.0

PUC Center

Registration No.:

 

3.0

Objective of the test: To carry out Physical check and calibration of gas                                        Analyser / Smoke meters as per the test procedure specified in Annexure 1 of  CMVR / TAP 115-116 Part-8.

                                      

4.0

4.1

 

4.2

Detailed Observations

Checking of supply/ earthing

 

Checking of                     Details of accessories checked.

accessories:

4.3

Span Calibration

 

     1.   Details of span gas concentration__________%

     2.   Calibration gas cylinder No.: __________

     3.   Calibration gas cylinder make:___________

     4.   Calibration gas validity date:___________

 

OR

 

    5.    Details of Natural Density filters used for mid point calibration

 

4.4

Electrical Calibration       OK/ Not OK

 

 

4.5

Leak test:

Passed/ Failed

5.0

One no of petrol / diesel vehicle checked for idling Emission / Free acceleration, measurement

6.0

Conclusion:

 

 

7.0

Next Calibration Due Date:

 

 

 

Signature & Seal of manufacturer/ Supplier

 

 

 

 


 

ARAI/TA(MOD_SM)/INDUS/OMS 101/2005-07                                                          Dated 4 March 2005

 

ANNEXURE – 3 TO ANNEXURE - A

 

PUC

Operator

Photograph

 
TRAINING CERTIFICATE

 

 

 

 

 

 

 

It is to certify that Mr. / Mrs. __________________________________________   has attended the training and knows all required operation of the smoke meter / Gas Analyser model ____________________________ to perform PUC tests.

 

Training is given in the following areas:

Understanding of procedure for testing of Idling emission/ free acceleration smoke as CMVR/ TAP/ 115/116 procedure.

 

1.                  Normal thermal condition of the vehicle

2.                  Actual testing procedure

3.                  Procedural understanding of issue of PUC certificate

 

Operation of smoke meter / Gas analyzer

 

  1. Vehicle testing mode

 

2.          Zero Calibration

 

3.          Span calibration

 


4.          Electronic calibration

 


5.          Leak test

 

Maintenance

 


1               Replacement of filters

2               General maintenance

 

 

  Authorized Signature & seal of manufacturer / supplier

 

*************

 

 


 

ARAI/TA(MOD_SM)/INDUS/OMS 101/2005-07                                                          Dated 4 March 2005

 

ANNEXURE-4 TO ANNEXURE-A

 

AMC CHARGES

 

 

 

Sr. No.

Details

4 Gas Analyser

2 Gas Analyser

Smoke Meter

1.

Maintenance done at centralized station of PUC equipment manufacturer

Rs.5,700/- + Rs.750/- per calibration

Rs.3,750/- + Rs.750/- per calibration

Rs.4,500/-

2.

Maintenance done at PUC center’s place

Rs.9,500/- + Rs.1,500/- per calibration

Rs.6,250/- + Rs.1,500/- per calibration

Rs.7,500/-

 

Note:

1.      For 2/4-gas anlyser, PUC equipment manufacturer shall provide the calibration gases required for calibration.

2.      For smoke meter, the AMC charges include calibration with neutral density filter (NDF) by PUC equipment manufacturer.

 

 

 

***************


 

ARAI/TA(MOD_SM)/INDUS/OMS 101/2005-07                                                          Dated 4 March 2005

 

 

ANNEXURE – B

 

 

MODIFICATIONS REQUIRED IN THE ORIGINAL CONFIGURATION FOR COMPLIANCE

 

WITH THE NEW REQUIREMENTS

 

 

 

1)         Electronic adaptor for RPM and oil temperature measurement

2)         RPM sensor with cable

3)         Thermocouple and cable with on sight calibration for oil temperature measurement.

4)         6-core cable for adaptor to control unit with D9 connector

 

***************

 

 

ARAI issues Type Approval Certificates for vehicles / components / parts / assemblies etc., based on the documents produced / submitted by the customer and on these basis, the vehicles / components / parts / assemblies, etc., are examined and if approved, the certificate is issued.  ARAI is in no way responsible for any misuse of copying of any design / type / system in connection with entire vehicle / components / parts and assemblies.  Breach of any statutory provision of Indian laws or laws of other countries, will be the sole responsibility of the customer and ARAI shall not be liable for any claims or damages, made by the party, whatsoever.  The customer shall alone be liable for the same and undertakes to indemnify ARAI in this regard.  Further, the ARAI has the right to initiate cancellation / withdrawal of the certificate issued, in case of any fraud, misrepresentation, when it surfaces and comes in the knowledge of ARAI. The appropriate local courts at Pune shall have the jurisdiction in respect of any dispute, claim or liability arising out of this certificate.