ARAI/TA(HC)/SARVESH/ZFE-1
REV.2/2005-35 Dated
20 Dec 2005
Cert |
Annex |
Drg |
Total |
1 |
6 |
0 |
7 pgs |
CERTIFICATE
FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES
M/s Sarvesh Analytics Pvt. Ltd.
Plot 425/1, Sector 21, Yamunanagar
Nigadi
Pune 411 044
Exhaust Gas Analyzer Model ZFE-1
Rev.2 from M/s Thermax Fuji Electric Ltd., Pune, was type approved for CO part
vide ARAI Certificate dated 20th April 1998. The same gas analyser model was additionally
examined and tested for HC part as per the revised test procedure specified in
MoRTH / CMVR / TAP-115/116, Issue No. 3, Part VIII.
Based on the above, it is
certified that the Exhaust Gas Analyzer Model ZFE-1 Rev.2 manufactured by Fuji
Electric Co. Ltd., Japan, and marketed by M/s Sarvesh Analytics Pvt. Ltd.,
Pune, meets the requirements of the provisions of Rule 116(3) of the
Central Motor Vehicles Rules 1989, as amended up-to-date, for the exhaust gas
analyzer.
The
2-Gas Analyser Model ZFE-1 Rev.2 is suitable for measurement of idling CO and
HC of in-use 2, 3 and 4 wheeler (other than Bharat Stage II and above
compliant) vehicles fitted with SI engines, as per CMVR 115(2), subject to
following conditions :
i.
For
the instruments already supplied in the field, the supplier shall calibrate HC
channel along with CO channel and issue a compliance certificate based on which
the Transport Authorities concerned will grant extension of validity to the
respective PUC Test Centre for the purpose of PUC testing as per revised test
procedure.
ii.
The
name of the model will be included by ARAI in the approved list of PUC
Equipment only on compliance to (i) above by the supplier.
iii.
The
supplier shall abide by the Code of Practice attached herewith as
Annexure-A. The supplier has already
submitted an affidavit to this effect.
iv.
The
supplier shall enter into AMC agreement on annual basis with the authorized PUC
Test Centres to whom this model is supplied.
The AMC terms shall be as per the Code of Practice referred in (iii)
above.
This Type Approval
certificate is valid for the period of 5 years from the date of its issue or
any amendment in the test procedure, whichever is earlier.
The supplier has discontinued supply of this model. Hence, this certificate is valid only for the units already supplied in the field on or before 30th June 2000.
A.B. Komawar Shrikant R Marathe
Dy. Director Director
Ref
:
i) ARAI
Type Approval Certificate No.ARAI/CMVR/THERMAX-FUJI/B/R 116(3)/98-03 dated 20th
April 1998 (for CO part of the analyser.)
ii) ARAI
Type Approval Test Report No.AED/SPR117/2005-06 /2005-192 dated 19 December
2005 (for HC part of the analyser).
ARAI/TA(HC)/SARVESH/ZFE-1
REV.2/2005-35 Dated
20 Dec 2005
1.
PUC equipment manufacturer / supplier should include the
description of the test procedure described in Part I or Part II, whichever is
applicable, amended from time to time of the document MOST/CMVR/TAP 115/116 in the
user’s manual of the PUC equipment. PUC
equipment manufacturer / supplier shall keep PUC operator informed about the
changes in the test procedure in future.
2.
PUC equipment manufacturer/ supplier shall supply copy of
type- approval certificate with date of validity along with the PUC equipment.
3. The validity of the type approval certificate of the PUC equipment shall be 5 years, after the expiry of which the PUC equipment manufacturer/ supplier shall get it re-validated from the test agency.
4.
PUC equipment manufacturer / supplier shall provide the
status of production/ supply of PUC equipment at a regular interval of 1 year
to the test agency from where the equipment has been certified.
5.
PUC equipment manufacturer / supplier shall submit the
equipment for COP as per procedure mentioned above.
6.
PUC equipment manufacturer / supplier shall enter into AMC
on annual basis with the authorised PUC test agency based on charges as
approved and finalized in EECG meeting as per Annexure-4. This AMC contract
shall include 3 visits and equipment calibration as per field calibration
procedure given in Annexure-1. PUC
equipment manufacturer/ supplier shall provide calibration certificate as per
format given in the Annexure-2.
7.
PUC equipment manufacturer / supplier shall train minimum 3
operators of PUC test agency and shall provide training certificate as per
format given in Annexure 3.
***********
ARAI/TA(HC)/SARVESH/ZFE-1
REV.2/2005-35 Dated
20 Dec 2005
ANNEXURE –
1 TO ANNEXURE – A
FIELD
CALIBRATION PROCEDURE FOR TESTING OF
GAS
ANALYSERS
1.0
INTRODUCTION
This
procedure has to be carried out on gas analysers after they are commissioned in
the field and for the subsequent calibration.
2.0
TESTING
The test
procedure for gas analysers is as follows:
i)
Check that the power supply is as per specifications of the
manufacturer and electrical earthing is proper.
ii)
Check that all the accessories as per manufacturer are
available and are functioning properly.
iii)
Check the span and zero calibration using sample gas of suitable
value for CO as well as HC.
iv)
Check the electrical calibration.
v)
Check that the sampling system is leak proof.
vi)
The printer is working correctly and the print out details
are correct.
vii)
Checking of 1 no. of vehicle for idling emission measurement
using this analyzer.
************
ARAI/TA(HC)/SARVESH/ZFE-1
REV.2/2005-35 Dated
20 Dec 2005
ANNEXURE – 1 TO ANNEXURE – A (contd…..)
FIELD
CALIBRATION PROCEDURE FOR TESTING OF
SMOKE
METERS
1.0
INTRODUCTION
This
procedure has to be carried out on meters after they are commissioned in the
field and for the subsequent calibration.
2.0
TESTING
The test
procedure for smoke meters is as follows:
i)
After the warm-up of the meter, the calibration of the meter
has to be checked at zero and midscale point with the neutral density filter
available. The value must lie within
0.1 m-1.
ii)
The meter shall have the standard accessories as specified
by the manufacturer. It shall be
checked that the sample hose, internal pipes etc are not deteriorated or
damaged to ensure that there is no leakage.
iii)
The functionality of oil temperature and RPM sensor.
iv)
The heating system for the optical chamber is functioning.
v)
The purge air system is working correctly.
vi)
Visual displays are functioning correctly.
vii)
The printer is working correctly and the printout details
are correct.
viii)
The instrument casing is proper and has proper electrical
earthing.
ix)
Free acceleration test is carried out using a vehicle and
the print out details are checked.
************
ARAI/TA(HC)/SARVESH/ZFE-1
REV.2/2005-35 Dated
20 Dec 2005
ANNEXURE
– 2 TO ANNEXURE - A
CALIBRATION
CERTIFICATE FORMAT
1.0 |
Component: PUC equipment model: Sr. No. |
|
2.0 |
PUC Center Registration No.: |
|
3.0 |
Objective of the test: To carry
out Physical check and calibration of gas Analyser / Smoke meters
as per the test procedure specified in Annexure 1 of CMVR / TAP 115-116 Part-8. |
|
4.0 4.1 4.2 |
Detailed Observations Checking of supply/ earthing Checking of Details of accessories checked. accessories: |
|
4.3 |
Span Calibration 1.
Details of span gas concentration__________% 2.
Calibration gas cylinder No.: __________ 3.
Calibration gas cylinder make:___________ 4.
Calibration gas validity date:___________ OR 5.
Details of Natural Density filters used for mid point calibration |
|
4.4 |
Electrical Calibration OK/ Not OK |
|
4.5 |
Leak test: |
Passed/ Failed |
5.0 |
One no of petrol / diesel vehicle checked for idling
Emission / Free acceleration, measurement |
|
6.0 |
Conclusion: |
|
7.0 |
Next Calibration Due Date: |
|
Signature &
Seal of manufacturer/ Supplier |
ARAI/TA(HC)/SARVESH/ZFE-1
REV.2/2005-35 Dated
20 Dec 2005
ANNEXURE –
3 TO ANNEXURE - A
|
It is to certify that Mr. / Mrs.
__________________________________________
has attended the training and knows all required operation of the smoke
meter / Gas Analyser model ____________________________ to perform PUC tests.
Training is given in the following
areas:
Understanding of procedure for
testing of Idling emission/ free acceleration smoke as CMVR/ TAP/ 115/116
procedure.
1.
Normal thermal condition of the vehicle
2.
Actual testing procedure
3.
Procedural understanding of issue of PUC certificate
2.
Zero
Calibration
3.
Span
calibration
4.
Electronic calibration
5.
Leak test
Maintenance
1
Replacement of filters
2
General
maintenance
Authorized Signature & seal of
manufacturer / supplier
*************
ARAI/TA(HC)/SARVESH/ZFE-1
REV.2/2005-35 Dated
20 Dec 2005
Sr. No. |
Details |
4 Gas
Analyser |
2 Gas
Analyser |
Smoke
Meter |
1. |
Maintenance done at centralized station of PUC equipment
manufacturer |
Rs.5,700/- + Rs.750/- per calibration |
Rs.3,750/- + Rs.750/- per calibration |
Rs.4,500/- |
2. |
Maintenance done at PUC center’s place |
Rs.9,500/- + Rs.1,500/- per calibration |
Rs.6,250/- + Rs.1,500/- per calibration |
Rs.7,500/- |
Note:
1.
For 2/4-gas anlyser, PUC equipment manufacturer shall
provide the calibration gases required for calibration.
2.
For smoke meter, the AMC charges include calibration with
neutral density filter (NDF) by PUC equipment manufacturer.
***************
Place of Issue : Pune
ARAI issues
Type Approval Certificates for vehicles / components / parts / assemblies etc.,
based on the documents produced / submitted by the customer and on these basis,
the vehicles / components / parts / assemblies, etc., are examined and if
approved, the certificate is issued.
ARAI is in no way responsible for any misuse of copying of any design /
type / system in connection with entire vehicle / components / parts and
assemblies. Breach of any statutory
provision of Indian laws or laws of other countries, will be the sole
responsibility of the customer and ARAI shall not be liable for any claims or
damages, made by the party, whatsoever.
The customer shall alone be liable for the same and undertakes to
indemnify ARAI in this regard. Further,
the ARAI has the right to initiate cancellation / withdrawal of the certificate
issued, in case of any fraud, misrepresentation, when it surfaces and comes in
the knowledge of ARAI. The appropriate local courts at Pune shall have the
jurisdiction in respect of any dispute, claim or liability arising out of this
certificate.