{"id":7675,"date":"2026-04-01T12:41:23","date_gmt":"2026-04-01T12:41:23","guid":{"rendered":"https:\/\/www.araiindia.com\/mr\/?post_type=capability&#038;p=7675"},"modified":"2026-05-11T13:20:02","modified_gmt":"2026-05-11T13:20:02","slug":"bms-test-system","status":"publish","type":"capability","link":"https:\/\/www.araiindia.com\/mr\/capabilities\/bms-test-system\/","title":{"rendered":"ARAI \u091a\u0947 \u0905\u0924\u094d\u092f\u093e\u0927\u0941\u0928\u093f\u0915 BMS \u091a\u093e\u091a\u0923\u0940 \u092a\u094d\u0930\u0923\u093e\u0932\u0940 \u2014 \u091c\u0932\u0926, \u0938\u0941\u0930\u0915\u094d\u0937\u093f\u0924 \u0906\u0923\u093f \u0905\u0927\u093f\u0915 \u0935\u093f\u0936\u094d\u0935\u093e\u0938\u093e\u0930\u094d\u0939 \u092a\u094d\u0930\u092e\u093e\u0923\u0940\u0915\u0930\u0923\u093e\u0938\u093e\u0920\u0940 \u0924\u092f\u093e\u0930 \u0915\u0947\u0932\u0947\u0932\u0947"},"content":{"rendered":"<p>The Battery Management System (BMS) space is evolving fast, and robust validation early in development is becoming essential. To support this, ARAI\u2019s Advanced Battery Test Centre is now equipped with a state-of-the-art BMS testing system built to push validation boundaries right from the development stage.<\/p>\n<p>\u00a0<\/p>\n<p><strong>Key capabilities:<\/strong><\/p>\n<p>\u00a0<\/p>\n<ul>\n<li>Power-level cell simulation up to 108 cells (up to 7V, 2A per cell)<\/li>\n<li>High-accuracy test reproducibility using FPGA-based real-time interfaces<\/li>\n<li>Integrated fault insertion enabling easy, safe, and repeatable unit-cell level fault testing<\/li>\n<\/ul>\n<p>\u00a0<\/p>\n<p><strong>Comprehensive Validation Coverage Includes:<\/strong><\/p>\n<p>\u00a0<\/p>\n<ul>\n<li>Functional validation of BMS behaviour across operating conditions<\/li>\n<li>Testing of protection features (fault scenarios, limits, interlocks)<\/li>\n<li>Communication verification (e.g. CAN-based monitoring)<\/li>\n<li>Automated sequences with structured logging and reporting<\/li>\n<li>Configurable architecture to match different pack\/BMS platforms<\/li>\n<\/ul>\n<p>\u00a0<\/p>\n<p>As a snapshot from one of the performed tests, the graph shows systematic error percentage in voltage measurement, and it helped identify above-average voltage measurement error for Cell 1, enabling the team to catch it in the initial stages of development itself.<\/p>\n<p>\u00a0<\/p>\n<p>With this robust testing framework, suppliers and OEMs can gain data-driven insights into hardware performance, driving time and cost savings in the long run.<\/p>\n<p>\u00a0<\/p>\n<p>ARAI also offers tailor-made test capabilities backed by an experienced team to match your BMS validation requirements.<\/p>\n<p>If you\u2019re working on EV battery packs, energy storage systems, or BMS validation, we are glad to connect and share how this setup can fit your test strategy.<\/p>\n<p>\u00a0<\/p>\n<p>Share you requirement at <strong><a class=\"WKVSfLCavKyjywFEXwZDFLAfdDosdiAqrY \" href=\"mailto:enquiry@araiindia.com\" target=\"_blank\" rel=\"noopener\" data-test-app-aware-link=\"\">enquiry@araiindia.com<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Battery Management System (BMS) space is evolving fast, and robust validation early in development is becoming essential. To support this, ARAI\u2019s Advanced Battery Test Centre is now equipped with a state-of-the-art BMS testing system built to push validation boundaries right from the development stage. \u00a0 Key capabilities: \u00a0 Power-level cell simulation up to 108 \u2026 <a href=\"https:\/\/www.araiindia.com\/mr\/capabilities\/bms-test-system\/\">Continued<\/a><\/p>\n","protected":false},"template":"","meta":{"_acf_changed":false},"class_list":["post-7675","capability","type-capability","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.araiindia.com\/mr\/wp-json\/wp\/v2\/capability\/7675","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.araiindia.com\/mr\/wp-json\/wp\/v2\/capability"}],"about":[{"href":"https:\/\/www.araiindia.com\/mr\/wp-json\/wp\/v2\/types\/capability"}],"wp:attachment":[{"href":"https:\/\/www.araiindia.com\/mr\/wp-json\/wp\/v2\/media?parent=7675"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}