|
| Testing & Calibration EMI /EMC |
The EMI/EMC laboratory of AED accredited as per ISO 17025 is offering its evaluation testing services to the auto component, auto electronics, embedded & IT industry in the following areas:
Radiated Immunity
| |
As per test standards 95/54/EC, 2004/104/EC, ECE R-10, ISO 11452 etc. |
 |
| ALSE Chamber |
|
| |
Different test methods available viz. Free Field method in ALSE chamber (ISO 11452-2), TEM Cell method (ISO 11452-3), BCI method (ISO 11452-4), 150 mm Stripline method (ISO 11452-5) |
| |
Electromagnetic field up to 100 V/m with different modulation like AM, FM, Pulse |
| |
Frequency range of 10 kHz-2000 MHz |
| |
The system allows video/audio as well as status monitoring of EUT for performance verification. |
Radiated / Conducted Emission
| |
As per CISPR, ECE R-10, 95/54/EC, 2004/104/EC, etc. |
 |
| EMI Test Receiver |
|
| |
Frequency range : 150 kHz to 3000 MHz |
| |
QP, Peak, Average detector measurements |
| |
Tests performed in ALSE Chamber/OATS |
| |
|
Conducted Immunity and Transient Emissions
| |
As per Test Standards such as ISO 7637, SAE J1113, SAE 1455, manufacturer specific standards, etc. |
Electrostatic Discharge (ESD)
| |
As per Test Standard ISO:10605 and IEC 61000 4-2 |
| |
±30 kV Contact and Air Discharge |
| |
Various RC combinations for discharge gun as per standards |
EMI/EMC Testing of Industrial Electronic Systems
| |
IEC 61000-4-3, Radiated Immunity |
 |
| Scan Tool |
|
| |
IEC 61000-4-4, (EFT)Burst on power line |
| |
IEC 61000-4-4, (EFT) Burst on signal line-capacitive coupling clamp |
| |
IEC 61000-4-5, Surge on power line |
| |
IEC 61000-4-11, Power fail simulation |
| |
IEC 61000-4-8, Power frequency (50Hz) magnetic field |
| |
IEC 61000-4-6, Conducted disturbances induced by radio frequency fields, CDN, EM clamp |
The EMI/EMC laboratory has established "EMC PRECISION SCAN SYSTEM", a completely new engineering tool which provides near field measurements for printed circuit boards, and other electronic parts and wirings thus taking care of EMI problems at the design stage itself.
|
|